TRACE by ISB Global
Home›DWT guides›Checklist

Checklist

DWT Checklist for Waste Receiving Sites

A practical DWT checklist starts with confirming your site's reporting obligations, then identifying the required waste data, choosing a reporting route and assigning responsibility for validation and corrections. Test a complete receipt-to-confirmation journey, including a failed record, before relying on the process for day-to-day reporting.

4 min readReviewed 26 October 2026By ISB Global
01

Are you ready for DWT?

Use this checklist to assess your readiness.

02

Operational data

  • Waste types recorded consistently
  • Site information maintained
  • Carrier details available
  • Customer and supplier records up to date
03

Systems and processes

  • Digital records available
  • Staff understand current workflows
  • Existing software identified
  • Spreadsheet processes documented
04

Reporting

  • Data can be exported electronically
  • Records can be validated before submission
  • Responsibility for submissions assigned
05

Next step

Identify where your data currently resides and determine the simplest route into DWT.

06

How TRACE helps

TRACE connects the data you already hold, checks it against DWT requirements and shows what is ready, missing or needs correcting before submission.

07

What should you test before relying on the workflow?

Use a representative receipt with the correct site, carrier, material, quantity and applicable recovery or hazardous information. Check that required fields reach the reporting route without manual reformatting. Then test how your team identifies a rejection, finds the affected record, corrects it and confirms the result. Document who owns unresolved exceptions and cover for staff absence.

↗

Sources and further reading

ISB Global guidance, checked against the government sources below. Confirm current requirements and exemptions for your operation.